New London’s Aquatic and Fitness Center opened up June 10th after a $1 million mechanical system upgrade. The center was closed to the public from March 12th until June 4th. The building now has energy efficient LED lighting, a new water slide, the pool now has two disability lifts, an upgraded ventilation system and a new heating system. the structure was built in 1980 and many of the components from the original construction kept it going until now.